Projects within the framework of open4innovation
There are 703 results.
New market potential for Wood Plastic Composites by applications for injection moulding
Wood Plastic Composites (WPC) should gain new market potential and create new value via applications in injection moulding. Therefore it is necessary to develop a formulation suitable for injection moulding to access the existing market potential.
New potentials using hardwood with small diameters in forestry and timber industry
Identification of potentials to use hardwood with small diameters (SDH) in Austria with the help of the value added chain from the forest's location to the processor. Analysis and evaluation of availability, quality and market potential.
New4Old - New energies for old buildings
The project "New4Old - New energy for old buildings - Promoting the integration of RES & RUE measures in historic buildings" aims to promote the integration of renewable energy and energy efficiency technologies into historic buildings, and to create a European-wide network of Renewable Energy Houses in the different Member States of the European Union.
OEKOPLUS-KOMPLEX - Analysis of the technical, economical and ecological preconditions for the establishment and utilisation of plus-energy-buildings and building assemblies
The evolution of the low energy house and the passive house standards to the plus energy standard results in a clear reduction of green house gas emissions as well as the primary energy input. The goal of the project was the determination of the technical, ecological and economic basic conditions for the construction and the use of "plus-energy-buildings" in order to finally realize them.
OPEN LIVING PLUS - building structures and utilization options with high social functionality and plusEnergie-standard for rural regions
In small to medium sized communities in rural Regions there is a high demand for sustainable building and space for innovative living facilities, to satisfy the requirements of current and coming life designs. The project’s intentions were to provide social scientific groundwork, develop building structures and utilization options of high social functionality and to transfer knowledge to decision makers in communities and regional authorities.
OctoAI: The next generation of high-performance edge AI for smart buildings
Current IoT (Internet of Things) solutions for buildings depend almost exclusively on cloud infrastructure and cloud-based services. In the OctoAI project, we are developing the next generation of high-performance Edge AI (Artificial Intelligence) for smart buildings. In OctoAI, we combine the concept of edge AI with user-centric energy services and test two edge-ready applications.
Oekosan 09 - International symposium for high-quality energetic renovation of large-scale buildings
From October 7 to 9, 2009 the AEE INTEC has organized an international symposium "Ökosan 09". The emphasis of the symposium was the communication of (partial) results of running and closed cooperation projects by leading technical experts dealing with the retrofit of large-scale buildings.
Oekosan'11 - International symposium for high-quality retrofit of large-volume buildings to plus-energy-buildings
The AEE INTEC organized the international congress "ökosan'11 - high-quality retrofit of large-volume buildings to plus-energy-buildings" in September 2011. The position of Austrian companies in international cooperation was strengthened through personal contacts during the conference.
Office Building WKS - Plus Energy Office Building in Ernstbrunn
The new office building (headquarter) of Windkraft Simonsfeld AG in Ernstbrunn (Lower Austria) is planned as a plus energy building. From this excellent starting conditions it is intended to make seven more steps to explore innovative options for energy plus buildings.
Online reference for ecologically rated building construction details suitable for achieving Passivhaus standard
An already well-established web database management system is being adapted to present the contents of a catalogue of building elements for the Passivhaus standard. A wider distribution of the contents and future extensions of the catalogue by distributed workgroups are the promises of the project.
Open up Austria's biomass potential till 2050
Development of an optimal strategy to open up Austria's biomass potential until the year 2050. The optimal strategy maximizes the reduction of GHG emissions. Provision of an action plan for a temporal dynamic implementation of this strategy.
Operational and maintenance costs in passive houses and low energy houses
How much energy does a passive house actually save? Does a passive house pay-off by itself? What are the costs for maintancence? For the first time an approximation for the running costs of a passive house were systematically documented and compared.
OptiMAS - Optimization of building energy efficiency through model-based energy flow analysis with non-invasive sensors
Using a model-based energy flow analysis supported by non-invasive sensor technologies OptiMAS investigated how to monitor, analyze and optimize existing buildings independent of the installed HVAC systems and automation components. With the OptiMAS approach the optimization potential of individual buildings up to entire areas can be detected, located and tapped by adjustment of system parameters to ensure highest energy and resource efficiency.
Optimisation of ecological construction components for industrial serial production of precast elements
The project focused on passive house elements from straw and clay. Special interest was paid at a novel straw insulation as well as at an efficient drying process of the clay. Sustainability of the building materials was a very important aspect within the project.
Optimisation of logistics for different supply and distribution systems at large biogas plants
Technological and economic analysis and suggestions for the continual improvement of logistics for the supply and disposal of material at biogas plants.
OttoWagner-ArealPlus - Feasibility study for a certified plus-energy-district-renovation of the listed Otto-Wagner-Area
Development of an innovative concept for the transformation of the Viennese Otto-Wagner-Area into a plus-energy-quartier while meeting requirements of cultural heritage management. The historic architectural jewel covers an area of around 50 hectares, consists of 70 buildings and a gross floor area of around 200,000 m². The solution meets highest energy efficiency standards and comfort requirements.
P2H-Pot - Potentials, economic feasibility and system solutions for Power-to-Heat
P2H-Pot has identified economically feasible potentials for Power-to-Heat (P2H) in urban regions. The suitability of different technical system configurations were investigated using thermodynamic simulation and considering experiences from Scandinavian cases. The assessment of short, medium and long term relevance and economic feasibility of P2H were accomplished by simulating model-based scenarios up to 2050 of the Austrian and German electricity and heat market. In cooperation with a district heating company three case studies have been carried out.
P2PQ - Peer2Peer im Quartier
The research project Peer2Peer im Quartier deals with applications optimizing the selfconsumption of PV-generated energy within urban quarters by enabling peer-to-peer relations among energy prosumers based on Blockchains. Aim is to develop and validate these applications in real operation.
PEAR – Test facility for energy efficient automation and control of buildings
The energy demand calculated in the design phase often differs from measured values in the actual building operation. This projects reviews building automation and operation by presenting a solution how to assess energy efficiency of control strategies in the fields of air conditioning systems, concrete core activation and free cooling. The results are implemented in the demonstration building "Post am Rochus".
PEB - Plus-Energy-Office
An integrated technical energy plus office concept without additional building costs demonstrates the feasibility of such projects instancing a concrete office project with 50.000 m² floor area in Vienna with economical cost consideration.